Why rooftop units need a schedule
A rooftop unit (RTU) packages heating, cooling, and the blower in one cabinet on the roof. One unit often serves a whole suite or storefront, so when it stops, a tenant notices within the hour.
RTUs tend to fail when they are working hardest, which means the hottest week in July or the coldest week in January. Scheduled maintenance catches most of the problems that cause those failures while they are still small. Our rule is a spring check before cooling season and a fall check before heating season. Tenants notice the one you skip. The checklist below is what we cover on commercial HVAC maintenance visits.
Every visit
These items get checked in both spring and fall:
- Filters. Change them, and confirm they are the right size and seated properly in the rack. Air that goes around a filter carries dirt straight to the coil. Busy buildings may need changes between seasonal visits.
- Belts and blower. Check belt tension, wear, and alignment, and look at the pulleys and bearings. A slipping belt means less air and a squeal that tenants hear.
- Condensate drain and pan. Clear the drain and trap, and check the pan for rust or cracks. A blocked drain can overflow into the building.
- Electrical connections and contactors. Tighten connections and look at contactors for pitting or burn marks. Check motor amperage against the nameplate.
- Thermostat and controls. Confirm the unit responds to a call for heat and cooling, and that the schedule matches the tenant's hours.
- Cabinet panels. All panels in place, screws secured, gaskets intact.
Spring: before cooling season
The spring visit gets the unit ready to reject heat all summer. Most of the work is on the cooling side.
- Condenser coil. Clean it. A coil packed with dirt, cottonwood fluff, and debris can't shed heat, and the unit loses capacity right when it's needed. See rooftop coil cleaning for what that looks like on the roof.
- Evaporator coil. Inspect it and clean it if needed. A dirty evaporator coil restricts airflow and can freeze up.
- Condenser fan motors and blades. Check for worn bearings, cracked blades, and loose set screws.
- Refrigerant circuit. Read pressures and temperatures with the unit running. Look for signs of a leak.
- Economizer. Test that the dampers open and close through their range.
- Condensate drain. Clear it again before it has to carry water all summer.
Fall: before heating season
Most gas-fired RTUs have a heat section built into the cabinet. It sits idle all summer and then has to light reliably on the first cold morning.
- Burners. Inspect and clean them, and watch the flame on start-up.
- Igniter and flame sensor. Check both, since they are common reasons a heat section fails to light.
- Heat exchanger. Inspect for cracks, rust, and heat damage.
- Gas pressure. Check it at the valve with the heat section running.
- Flue and inducer. Make sure the flue outlet is clear of nests and debris, and that the inducer motor runs quietly.
- Safety controls. Confirm the limit and rollout switches work as they should.
- Economizer. Confirm the dampers close to their minimum position so the unit isn't pulling in more cold air than it should.
The economizer deserves its own look
An economizer lets the unit use cool outdoor air for cooling when the weather allows, and it controls how much fresh air comes in the rest of the time. It has dampers, a linkage, an actuator, and sensors, all of which live outside on a roof.
When an economizer sticks open in winter, the heat section works harder and the space runs cold near the diffusers. When it sticks closed, the unit misses out on free cooling and the space gets less fresh air. Neither shows up as an obvious breakdown, which is why it gets missed. If tenants complain the space is stuffy, ventilation is worth looking at alongside the RTU, and our page on ventilation and indoor air quality covers that side.
Refrigerant: the signs we look for
Adding refrigerant to a unit without finding out why it is low only puts off the next call. The signs of a leak or charge problem are oily residue at fittings or on the coil, ice on the suction line, pressures that don't match the conditions, and a unit that runs long without cooling even though the coils are clean. When we see those, we look for the leak before charging the system.
Roof curb and panel condition
The unit sits on a curb that is part of the roof. If the curb gasket or flashing fails, water can get into the building below. A stained ceiling tile under a rooftop unit is a reason to check the curb.
Loose or missing panels let rain into the cabinet and are a common source of rattling that tenants hear through the ceiling. Rust on the base pan or cabinet is worth noting at every visit, because it tells you how much life the cabinet itself has left.
Keep a log for each unit
A simple record per unit makes every future decision easier. Note the date of each visit, filter size and change dates, belt size, refrigerant and gas readings, and any parts replaced. When a unit starts needing repairs more often, the log shows it, and it gives you something concrete to plan a budget around.
When to plan a replacement
Maintenance extends the life of a rooftop unit, up to a point. These are the signs it is time to plan a replacement:
- The unit has reached the end of its expected service life on the building's equipment schedule.
- Repairs have become quarterly.
- The unit runs on a refrigerant that is obsolete.
- The heat exchanger is cracked or badly rusted.
- Parts are hard to find or discontinued.
What a planned replacement looks like
A planned replacement lets you pick the date, instead of the weather picking it for you. A new unit usually goes up by crane and lands on the roof curb, and gas, power, and controls are connected once it is set. You can see the steps in setting a new rooftop unit by crane. If the new unit's footprint doesn't match the old curb, a curb adapter may be needed, which we check before ordering.
In an occupied building, the crane lift and the changeover often have to be scheduled around tenants. Knowing a replacement is coming gives you time to coordinate that. We work from the building's equipment schedule, and for larger or mixed-use buildings, from an engineer's load calculation.
Mechanical rooms and the rest of the building
Many buildings with rooftop units also have a mechanical room with boilers, pumps, and shared systems feeding several tenants. Those are worth putting on the same schedule. See boiler and mechanical room service for that side of the building.
We work on rooftop units and packaged equipment across Toronto and the GTA, for retail, office, and multi-unit buildings, including units we didn't install. To set up a maintenance schedule, request commercial service with the number of units and how the roof is accessed.